Main Contractor for Upgrade Sewer Gullies/Drains/Storm Water Sumps/Resurface Rear Driveway Taxi Access at Naenae Primary School (Wellington)

Details

Tender Closed
RFx ID : 30020931
Tender Name : Main Contractor for Upgrade Sewer Gullies/Drains/Storm Water Sumps/Resurface Rear Driveway Taxi Access at Naenae Primary School (Wellington)
Reference # :
Open Date : Friday, 23 August 2024 9:00 AM (Pacific/Auckland UTC+12:00)
Close Date  : Wednesday, 18 September 2024 5:00 PM (Pacific/Auckland UTC+12:00)
Department/Business Unit : Board of Trustees - Approve by BoT - ie. School Principal
Tender Type : Request for Tenders (RFT)
Tender Coverage : Sole Agency  [?]
Categories :
  • 72000000 - Building and Facility Construction and Maintenance Services
Regions:
  • Wellington
Exemption Reason : None
Required Pre-qualifications : None
Contact : All responses via GETS
Alternate Physical Delivery Address  : All responses via GETS
Alternate Physical Fax Number  :
Overview

a. Background: The BOT at Naenae Primary School are seeking the services of a main contractor to undertake the construction works associated with drainage upgrade works & resurfacing of the rear driveway. There is a high needs conductive education unit that has primary drop off at the end of the driveway which will need to be considered when works take place.
b. Programme: The works estimated to begin in Term 4 school holidays 2024.
c. Project consultants are:
 Project Manager: IR Group
 Lead Designer: IR Group
d. The Contract Works required are:
 Clean drains and gully traps as indicated in Architectural plans
 Excavation and removal of existing drains as indicated in Architectural plans.
 Excavation and removal of existing asphalt as indicated in Architectural plans.
 Instal new drains, manhole covers, gully trap covers as indicated in Architectural plans.
 Install new kerb and channel; and dish channels as indicated in Architectural plans.
 Make good to ground surfaces around the new sumps
 Resurfacing of driveway surface with new asphalt as indicated in Architectural plans.
 Remove all debris upon completion
 The construction activities are throughout the site at the specified locations
 The works are to ideally be undertaken as a single stage.
b. Size/scale: Site wide project adjacent to Southern wing of Block A.